1 | Location | Port of Biringkassi, South Sulawaesi Province, Indonesia Coordinat: 04" - 49" LS 119" - 28" BT |
2 | Port Operator | Pelsindo (Pelabuhan Biringkassi Indoneis) |
3 | Max. Draught | 10.5 Meter LWS (high Tide at 1.0 - 1.2 Meter) at Jetty #1 North West Quay, Channel & Turning Basin |
4 | Max. Vessel Capacity | 40,000 DWT (at #1 - North West Wharf @ 10.5 Meter LWS Draft) 10,000 DWT (at #2 @ 6.0 Meter LWS Draft) 10,000 DWT (at #3 @ 7.5 Meter LWS Draft) |
5 | Jetty Length / Width | Jetty #1 @ 570.5 Meter (Both Sides) / Width @ 32.0 Meter Jetty #2 @ 94.6 Meter (Single Side) / Width @ 31.85 Meter Jetty #3 @ 122.0 Meter (Both Sides) / Width @ 20.0 Meter |
6 | Distance from Plant | 16.0 Km from Pangkep Plant |
7 | Commodity | Loading = Bag Cement, Raw Cement, Jumbo Cement and Clinker Discharging = Coal, FABA and Gypsum |
8 | Packer Capacity | (4 x 300,000) + (1 x 150,000) = 1,350,000 ton / year |
9 | Port Silo Capacity | Cement @ (8 x 6,000) _ (2 x 10,000 ton) = 68,000 ton |
10 | Loading and Discharging Equipment | Ship Loader (4 Raw Cement and 4 Bag Cement Slide), Truck (Clinker/Bag/Raw/Jumbo Cement) and Unloader (Coal) |
11 | Loading Rate | Bag Cement = 4,500 ton / day and Jumbo Cement = 2,250 ton / day Raw Cement = 9,000 ton / day (or 15,000 ton/day with dual Ship Loader) Clinker = 9,000 ton / day @Main Jetty and 4,000 ton / day @Transhipment |
12 | Discharging Rate | Coal/FABA/Gypsum = 5,000 ton / day (@Secondary Jetty) and 10,000 ton / day(@Tertiary Jetty) |
13 | Port Restrictions | High Tide Shifting |
14 | VHF Port Working Channel | VHF Ch. 08 & 16 |
15 | Contact Person | Senior Manager of Operation & Maintenance and PFSO - Ambo Masse, ST @ +62 81342198036 Port Master - Capt. Guntur @ +62 812-9022-8088 |
16 | Port Security Level | ISPS Level 1 |